Vanity Installation and Assembling Miami Beach
Details
Client Jonathan
Completed March 28th 2025
Timeframe Same Day Service
Location Helen mar condominium 2421 lake pancoast Dr Miami Beach fl 33140
This project involved the assembly and installation of a new bathroom vanity. The job included assembling the vanity cabinet, installing the sink and faucet, connecting plumbing, and securing the unit to the wall.
The flat-packed vanity cabinet was unpacked and inspected for any damage or missing parts. The cabinet was assembled according to the manufacturer’s instructions, including attaching side panels and doors and all connections were tightened securely to ensure stability.
The sink was placed onto the vanity countertop, ensuring a proper fit and any necessary sealants or adhesives were applied to prevent leaks. Then, the assembled vanity was carefully positioned against the wall, ensuring proper alignment with plumbing lines.
The vanity was leveled and secured to the wall studs using appropriate fasteners, ensuring stability and preventing movement. The water supply lines (hot and cold) were connected to the faucet and shut-off valves, ensuring leak-free connections and all plumbing connections were tested for leaks
Finally, a thorough inspection was conducted to ensure all components were properly assembled, installed, and functioning correctly and the customer was given a demonstration of the new vanity and its features.